Publications of relevance to RET Power stations

PDF
Australian Energy Flows 2008-09 16 Sep 2011
The Office of the Renewable Energy Regulator (ORER), in conjunction with Geoscience Australia, occasionally produces an Australian Energy Flow diagram to represent the amount of renewable energy supply and utilisation as compared to typical sources. In simple terms the supply side of the diagram represents the amount of resources that Australia has before the supply is placed into stock reserves. The diagram also represents the amount of sources that are received from imports before being utilis ...
PDF
Guide to wood waste eligibility assessment sheets 3 Apr 2012
This is a guide to the wood waste eligibility assessment sheets. The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (L ...
PDF
Guidelines for calculating eligible renewable generation when co-firing renewable fuels with coal 23 Mar 2012
Under the Renewable Energy (Electricity) Bill 2000, the renewables component of co-firing an eligible renewable energy source with fossil fuels will be eligible to receive large-scale generation certificates (LGCs). This short report sets out a methodology to calculate electrical output (MWh) from renewable fuels when co-fired with coal. The objective is to develop a formula/formulae/methodology that a Generator can easily apply to biomass co-firing situations to calculate the number of LGCs tha ...
DOC
Standard power station large-scale generation certificate (LGC) validation questions 23 Mar 2012
A registered person with an accredited power station(s), as stipulated in the Renewable Energy (Electricity) Act 2000, is eligible to create large-scale generation certificates (LGCs) using the internet based registry system, known as the REC Registry. Registered persons should: * familiarise themselves with Regulation 14 of the Renewable Energy (Electricity) Regulations 2001 (the regulations) which specifies the eligible electricity generation general formula, prior to creating LGCs; and * e ...
DOC
Wood waste assessment sheet - biomass from a native forest - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
PDF
Wood waste assessment sheet - biomass from a native forest – transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
DOC
Wood waste assessment sheet - manufactured wood product or by-product from a manufacturing process 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
PDF
Wood waste assessment sheet - manufactured wood product or by-product from a manufacturing process 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
DOC
Wood waste assessment sheet - manufactured wood product or by-product from a manufacturing process - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
PDF
Wood waste assessment sheet - manufactured wood product or by-product from a manufacturing process - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
DOC
Wood waste assessment sheet - non-native environmental weeds harvested for control or eradication 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
PDF
Wood waste assessment sheet - non-native environmental weeds harvested for control or eradication 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
DOC
Wood waste assessment sheet - non-native environmental weeds harvested for control or eradication - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
PDF
Wood waste assessment sheet - non-native environmental weeds harvested for control or eradication - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
DOC
Wood waste assessment sheet - sawmill residue 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
PDF
Wood waste assessment sheet - sawmill residue 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
DOC
Wood waste assessment sheet - sawmill residue - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
PDF
Wood waste assessment sheet - sawmill residue - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
PDF
Wood waste assessment sheet - waste products from the construction of buildings or furniture 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. These assessment sheets can be used by generators in building appropriate record sets to use in demonstrating the eligibility of wood waste. The use of the assessment sheets are not mandatory. However, claims for large-scale generation certificates (LGCs) that are supported by the recommended records are more likel ...
PDF
Wood waste assessment sheet - waste products from the construction of buildings or furniture - transitional 3 Apr 2012
The Clean Energy Regulator has developed a series of assessment sheets to assist generators interpret the wood waste provisions in the Renewable Energy (Electricity) Regulations 2001. The Renewable Energy (Electricity) Amendment Regulations 2011(No. 5) (the Amendment Regulations) specifically excludes the eligibility of electricity generated using biomass derived from a native forest to create LGCs in certain circumstances. However, Section 4 of the Amendment Regulations establishes a set of t ...
Date last updated: 03 Apr 2012