Annual Reporting
Electricity Generation Return for accredited RET power stations
Under Section 20 of the Renewable Energy (Electricity) Act 2000 (the Act), each accredited RET power station must submit an Electricity Generation Return by close of business 14 February (or any other date approved by the Regulator) each year for electricity generated in the previous year. Under Section 30E(1) of the Act, the Regulator may suspend the accreditation of a RET power station if the Electricity Generation Return is not lodged with the Clean Energy Regulator before the due date.
When a RET power station is accredited, an Electricity Generation Return must be completed for electricity generation starting from the date of accreditation to 31 December of that year and subsequently for each full year after that.
An Electricity Generation Return must be submitted for each RET power station accredited with the Clean Energy Regulator, including those RET power stations with nil generation for that year.
Please submit (by post) completed returns to:
Clean Energy Regulator
Renewable Energy Target
GPO Box 621
Canberra ACT 2601
The Clean Energy Regulator advises respondents that faxing the return to 1300 553 542 is undertaken at their own risk, as security cannot be guaranteed and original signed hard copies are required to be lodged by the due date.
Visit - Electricity Generation Return to download the forms
Date last updated: 27 Mar 2012